hero-image
Levelling the Future: Professional Site Preparation by 100% Solutions
  • 30 May,2025
  • Levelling of Site
  • 5 min read

Before the concrete is poured and the steel is erected, the success of every construction project starts with a levelled site. At 100% Solutions, we understand that site levelling is not just about flattening land — it’s about engineering stability, efficiency, and longevity into the very ground your structure will stand on.

Our approach to levelling includes cut-and-fill calculations, topographic surveying, and soil preparation tailored to your project’s size, slope, and soil condition. Whether you’re building a home, factory, school, or commercial center, our team ensures that your land is perfectly prepared to support safe, sustainable, and cost-effective construction.


Why Choose 100% Solutions for Site Levelling?

At 100% Solutions, we turn complex landforms into construction-ready platforms. Here’s why clients choose us:

  • Precision with Total Station & GPS Technology
    Get millimeter-accurate terrain mapping and layout control.

  • Eco-Friendly Earthwork
    Minimize environmental damage and reduce unnecessary soil movement.

  • Intelligent Drainage Planning
    Grading is optimized for natural runoff and erosion control.

  • Quick Turnaround Times
    Efficient machinery and planning ensure timely site preparation.

  • Regulatory Compliance
    We follow municipal and environmental guidelines for slope and soil safety.

  • Integrated with Foundation Design
    We coordinate with architects and engineers to align levelling with structure placement.


Frequently Asked Questions (FAQs)

Q1. What is site levelling and why is it essential?
Site levelling adjusts the slope or flatness of land, ensuring a stable base for construction and proper water drainage.

Q2. How do you calculate cut and fill volumes?
We use digital terrain models (DTMs) and software-based volume estimation to calculate accurate earthwork requirements.

Q3. Can levelling be done during the monsoon or rainy season?
It's not ideal. Wet soil can compromise compaction and slope stability. We recommend dry conditions for best results.

Q4. How much time does it take to level a 1-acre plot?
Depending on slope and soil, it typically takes 3–5 days with our advanced equipment.

Q5. Do you provide soil testing and compaction services too?
Yes. We offer soil bearing capacity (SBC) testing, compaction, and certification.

Frequently Asked Questions(FAQ)

  • flag-us
  • flag-us
  • flag-us